Asset Report

CP2 LNG - Phase 2

Get this report*

$2,700

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Venture Global CP2 and Venture Global CP Express, both wholly owned subsidiaries of Venture Global, are proposing to build, own and operate the CP2 project and the CP Express pipeline in Louisiana.The CP2 project will consist of two phases. Phase 2 will have a total liquefaction facility of 5.6 mmtpa and include 10 liquefaction trains and two 200,000 m3 storage tanks. The liquefaction trains will be identical to the mid-scale, modular design implemented at the operational Calcasieu Pass LNG ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Commercial structure
  • Timeline
  • LNG output
  • LNG contracts
    • Economic assumptions
      • Plant Economics
      • LNG Price
      • Fiscal and regulatory
    • Feedgas
    • Transport
    • Opex, fuel gas & power
    • Grid Breakeven Price
    • LNG Plant Breakeven Price
    • FOB Breakeven

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Commercial structure: Image 1
  • Timeline: Table 1
  • LNG output: Image 1
  • LNG contracts: Image 1
  • LNG contracts: Table 1
  • Summary economics
  • Breakeven economics (US$/mmBtu)
  • FOB breakeven analysis (post-tax)
  • Index Map

What's included

This report contains:

  • Document

    Phase 2

    PDF 1005.95 KB