Nigeria LNG (NLNG) - NLNG Upstream Supply
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Petroleum Industry Act
- Production Sharing Contracts
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Nigeria LNG (NLNG) - NLNG Six Commercial Overview
NLNG Six involved the construction of the sixth train at NLNG, increasing total capacity to 22.2 mmtpa
$2,700Nigeria LNG (NLNG) - NLNG Expansion Commercial Overview
In 2002 a third train at NLNG started production. This expansion included an LPG plant, allowing wet gas to be accepted for the first time.
$2,700Nigeria LNG (NLNG) - NLNG Seven
NLNG Seven is an expansion of the existing NLNG facility and will add 7.7 mmtpa of capacity. The project consists of a 4.2 mmtpa train, ...
$2,700