Asset Report

Caber zinc mine project

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Caber project is located roughly 35 km west of the town of Matagami, Nord-du-Quebec region. There are three mineralised zones on the Caber property: the Caber, Caber Nord and PD-1 deposits. The accompanying analysis considers a conventional underground mine using long hole mining methods with a targeted production rate of 3,000 t/d over a 9.5-year mine life. Ore will be transported by road (35km) to Glencore's Matagami concentrator to produce both zinc and copper concentrates.

Table of contents

  • Summary
  • Key issues
  • Emissions
  • CAPEX
  • Mining
  • Processing

Tables and charts

This report includes the following images and tables:

  • Caber Project Emission Intensity Quartile Ranking - total global production - tonnes Zn equivalent
  • Detailed map

What's included

This report contains:

  • Document

    Caber Project zinc mine

    XLS 365.00 KB

  • Document

    Caber zinc mine project

    PDF 1.65 MB