Asset Report

Gaspe (closed) copper smelter

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The smelter was commissioned in December 1955 to treat concentrates from the Gaspé mine. At commissioning the smelter operated a single green charge reverberatory furnace, two Peirce-Smith converters and a stationary anode furnace. In the early 1970s a fluid bed roaster was added and the reverberatory furnace converted to calcine charging. A 920t/d acid plant treating roaster and converter gas was added in 1973, and during this period the fixed anode furnace was replaced with a rotating...

Table of contents

  • Environmental

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Gaspe (closed) copper smelter

    PDF 1.17 MB