Asset Report

High Lake copper mine project

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The project area is extremely remote and lies within the arctic and sub-arctic zones. Development will involve considerable operational and environmental challenges. However, the deposit has the advantage of being backed by MMG Ltd which is 75% owned by the Chinese State. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
    • Detailed map
  • Road
  • Port
  • Power
  • CAPEX
  • Mining
  • Process
  • Royalties
  • Environmental

Tables and charts

This report includes the following images and tables:

  • High Lake Project Emission Intensity Quartile Ranking - Total global production - Tonnes Zn equivalent

What's included

This report contains:

  • Document

    High Lake copper mine project

    XLS 370.50 KB

  • Document

    High Lake copper mine project

    PDF 1.50 MB