Asset Report

Mansourah-Massarah gold mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Mansourah-Massarah project will be an open pit operation utilising conventional blast-load-haul mining methods. Ore will be processed through carbon-in-leach (CIL) and pressure oxidation (POX) circuits. A significant proportion of the ore is refractory in nature. Operations are scheduled to commence in 2022 with an annual average gold production of 250koz/a. Mine life is estimated at 12 years.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • Power
  • Water

Tables and charts

This report includes the following images and tables:

  • Detailed map

What's included

This report contains:

  • Document

    Mansourah-Massarah gold mine project

    XLS 119.00 KB

  • Document

    Mansourah-Massarah gold mine

    PDF 1.11 MB

  • Document

    Mms Flex.xlsx

    XLSX 821.43 KB