Asset Report

Montana Tunnels (Closed) gold mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Project commissioning was completed in 1987. Production continued to 2009 when the mine was placed on care and maintenance following a series of pit stability issues and ultimately a cracked ball mill shell although permits for a pit expansion were in place. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Mining
  • Process

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Montana Tunnels (Closed) gold mine

    PDF 1.12 MB