Asset Report

Pan gold mine project

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Pan Mine is a Carlin-style, open-pit, heap-leach mine in east-central Nevada. It is a conventional hard rock open pit mine that uses a contractor to drill, blast, load, haul, and provide support equipment. After restarting operations in September 2017, production has increased year over year. The production benefits are a result of heap leach pad expansion and the primary crushing circuit installed in 2020.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing

Tables and charts

This report includes the following images and tables:

  • Detailed map

What's included

This report contains:

  • Document

    Pan gold mine project

    XLS 126.50 KB

  • Document

    Pan gold mine project

    PDF 1.26 MB