Asset Report

Pomorzany-Olkusz zinc mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The operations included the Pomorzany and Olkusz mines, the Olkusz mill. The mill produced a zinc concentrate, a lead concentrate and from May 1997, a high grade zinc "bulk" concentrate has been produced as feed to the ISF smelter Miasteczo Slaskie. The zinc concentrate went to the integrated Boleslaw zinc smelter, a few kilometres away and the lead concentrate is exported. The mine closed at the end of 2020. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Emissions
  • Mining
  • Process

Tables and charts

This report includes the following images and tables:

  • Pomorzany-Olkusz Emission Intensity Quartile Ranking - Total global production - Tonnes Zn equivalent
  • Detailed map

What's included

This report contains:

  • Document

    Pomorzany-Olkusz zinc mine

    XLS 414.50 KB

  • Document

    Pomorzany-Olkusz zinc mine

    PDF 1.43 MB