PT Freeport Indonesia (Grasberg) gold mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
-
Mining
- Deep Mill Level Zone - DMLZ (2015 - 2041)
- Process
- New smelter
- Power
- Water
- Capex
-
Operating cost
- Labour
- By-Product Credits
Tables and charts
This report includes the following images and tables:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
PT Freeport Indonesia (Grasberg) copper mine
A detailed analysis of the PT Freeport Indonesia (Grasberg) copper mine.
$2,250Gresik copper smelter
A detailed analysis of the Gresik copper smelter.
$2,250Lerokis (Closed) gold mine
A detailed analysis of the Lerokis (Closed) gold mine.
$2,250