Asset Report

Turquoise Ridge gold mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

As of July 1, 2019 Barrick entered into a 61.5:38.5 joint venture with Newmont, concerning their Nevada based assets. As part of the joint venture Turquoise Ridge was combined with the Twin Creek complex, the combined mining operation is comprised of the Turquoise Ridge Underground, Vista Underground, and Turquoise Ridge Surface (the Mega and Vista open pits). All processing facilities are located at Turquoise Ridge Surface on what was formerly Newmont’s Twin Creeks property. To reflect the new joint venture agreement from July 1, 2019 onward the accompanying profile incorporates all production from the aforementioned mines. Prior to July 1, 2019 Twin Creeks production was included within our Newmont Nevada mine profile. In 2020, construction of the third shaft at the Turquoise Ridge Underground continued and the project was on target to be commissioned in late-2022. The project is expected to facilitate an increase in the mining rate to 1.4Mt/a.

Table of contents

  • Summary
  • Key Issues
  • Emissions
    • Turquoise Ridge Underground
  • Processing

Tables and charts

This report includes the following images and tables:

  • Turquoise Ridge Emission Intensity Quartile Ranking - total global production - tonnes Au equivalent
  • Detailed map

What's included

This report contains:

  • Document

    Turquoise Ridge (Getchell Mine) gold mine

    XLS 151.50 KB

  • Document

    Turquoise Ridge gold mine

    PDF 1.65 MB