Asset Report

Yulin Wei - Closed nickel operation

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Construction on the refinery started in July 2006 and was put into production in 2007 with a capacity of 2kt Ni/a. The operation was expanded to 5kt Ni/a and then doubled again to 10kt Ni/a. The refinery purchases electricity from the Electrical Power Bureau of BoBai County. The electricity is thermal generated. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Refining

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Yulin Wei nickel operation

    XLS 178.50 KB

  • Document

    Yulin Wei - Closed nickel operation

    PDF 1.21 MB