ADNOC Onshore
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
-
Geology
- Geological framework
- Reservoirs
- Well data
- Exploration
-
Reserves and resources
- Oil
- Gas and NGLs
- Reserves held under the current ADNOC Onshore concession (2015-2054)
- Reserves produced under the original ADCO concession (1939 - 2014)
- Resources for the post contract period beyond the current concession (2055 to 2064)
- Resources for the period beyond 2064
-
Production
- Oil
- Gas
- Emissions
-
Development
- Bu Hasa asset
- Bab asset
- Southeast asset (SE)
- Northeast Bab asset (NEB)
- Water injection
- Infrastructure
-
Costs
- Capital costs
- Operating Costs
- 3 more item(s)...
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- Index Map
- Detail Map
- Participation: Table 1
- Well data: Table 1
- Infrastructure: Table 1
- Cash Flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2025
- 21 more item(s)...
What's included
This report contains:
Other reports you may be interested in
ADNOC Gas Processing
ADNOC Gas Processing operates onshore gas processing facilities in Abu Dhabi. Three of the six gas plants – Bab, Asab 0&3 and ...
$5,280ADNOC LNG (ADGAS) - Commercial Overview
The ADNOC LNG plant is located on Das Island, 160 kilometres northwest of Abu Dhabi in UAE. The plant has been operational since 1977.
$2,700Cepu
The prolific Cepu block contains main oil producer Banyu Urip, Jambaran-Tiung Biru sour gas development, and more potential developments.
$6,900