Asset Report

Berbigao and Sururu

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Berbigão (including Sururu after the unitisation) is a pre-salt accumulation in the Santos basin. The field originates from the Iara discovery and was declared commercial in December 2014. Berbigão extends beyond the BM-S-11A concession (Iara area) boundary into the Entorno de Iara block. Its extension– Norte de Berbigão and Sul de Berbigão – hold minor volumes. Berbigão started producing oil in November 2019 through the P-68 FPSO. For a full analysis, please assess the Berbigão and Sul de Berbigão models together.

Table of contents

Tables and charts

This report includes the following images and tables:

  • Field Hydrocarbon Characteristics
  • Reserves (2P) at 01/01/2025
  • Production (2014-2023)
  • Production Profile - Berbigão
  • Production Profile - Sul de Berbigão
  • Capital Costs 2013 to 2022 (US$ million)
  • Annual Gas Prices
  • Index Map
  • Detail Map
  • Current participation
  • 16 more item(s)...

What's included

This report contains:

  • Document

    Berbigao and Sururu

    XLS 939.50 KB

  • Document

    Berbigao and Sururu

    PDF 2.65 MB