Asset Report

Bittern

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Bittern, which lies in the Central North Sea, was developed alongside the Guillemot West and Guillemot North West fields. Guillemot West, Guillemot North West and their three satellites are included in the Guillemot Area asset report. The combined development, including Bittern, was brought onstream in 2000. It is known as the Triton Project. The fields produce through subsea manifolds tied back to the Triton FPSO vessel, with oil exported via shuttle tankers. Sales gas is evacuated via a ...

Table of contents

  • Key facts
    • Summary
    • Key issues
      • Triton FPSO offline
      • Second FPSO compressor being installed
      • Infill drilling in 2024 should boost production
      • Triton FPSO cost share contingent on performance of new fields
      • Decommissioning liability retained by previous partners
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
    • Emissions
    • Drilling
    • Subsea facilities
    • Triton FPSO
    • Maintenance
  • Infrastructure
    • Decommissioning costs
    • Operating costs
  • 3 more item(s)...

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Index map
  • Bittern map
  • Participation: Table 1
  • Participation: Table 2
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Bittern production profile
  • Infrastructure: Table 1
  • 15 more item(s)...

What's included

This report contains:

  • Document

    Bittern

    PDF 4.46 MB

  • Document

    Bittern

    XLS 1001.00 KB