Bonan Block
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Emissions
-
Bozhong 19-6 cluster
- Bozhong 19-6
- Pilot phase
- Further details
- Phase I
- Further details
- Phase II
- Bozhong 13-2
- Bozhong 19-2
-
Bozhong 34 fields
- Bozhong 34-2/4 and Bozhong 34-3/5
- Platform summary
- Subsea
- FPSU summary
- Bozhong 34-1
- Platform summary
- Subsea
- Bozhong 34 fields and Bozhong 28-2S adjustment project
- 5 more item(s)...
-
Bonan Fields
- Bozhong 25-1/25-1S
- Platform summary
- Subsea
- Haiyangshiyou 113 FPSO Summary
- Bozhong 19-4
- Platform Summary
- Subsea
- Bozhong 28-1/26-2/26-3
- 18 more item(s)...
- Exploration Costs
- Capital Costs
- Operating Costs
- Cash Flow
- Gas price
- Global Economic Model (GEM) file
- 4 more item(s)...
Tables and charts
This report includes the following images and tables:
- Index Map
- Bonan Block Map
- Participation
- Reserves (2P) at 01/01/2025
- Production (2015-2024)
- Production (2015-2024)
- Production Profile - Bozhong 34 Fields
- Production Profile - Bonan Fields
- Production Profile - Bozhong 19-6 cluster
- Exploration Costs 2017 to 2025 (US$ million)
- Capital Costs Pre-2016 to 2024 (US$ million)
- 23 more item(s)...
What's included
This report contains:
Other reports you may be interested in
South Natuna Sea Block B
The South Natuna Sea Block B (SNSBB) PSC covers several oil and gas fields in the Natuna Sea.
$6,900B8/38 (Bualuang)
The Bualuang field is located in Block B8/38, in the west of the Gulf of Thailand. It was brought onstream in 2008 and developed in ...
$3,720Aram
Aram was awarded to Petrobras (80% and operator) in a consortium with CNPC (20%). It holds 29 billion barrels of unrisked reserves.
$3,720