Evelyn
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- Triton FPSO offline
- Second FPSO compressor being installed
- Rig contracted for development drilling in 2025
- Location maps
- Participation
- Geology
- Well data
- Reserves and resources
-
Production
- Emissions
-
Development
- Triton FPSO
- Infrastructure
-
Costs
- Decommissioning costs
- Operating costs
- Fiscal and regulatory
- 2 more item(s)...
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- Index map
- Detail map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves
- Production: Table 1
- Production: Table 2
- Production profile
- Infrastructure: Table 1
- Capital costs
- 13 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Guillemot Area
The Guillemot Area includes the Guillemot West, Guillemot North West, Clapham, Pict and Saxon fields. The fields lie to the west of the ...
$3,720Belinda
The small Belinda oil and gas field lies six kilometres southwest of the Triton FPSO. Shell discovered the field in 1990.Development ...
$3,720