Asset Report

Gassled-Statpipe

Get this report*

$2,580

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Statpipe was the first main gas gathering system built to take gas from fields in the Norwegian northern North Sea. The pipeline was constructed in four zones: Zones 1 and 2 incorporated the wet gas portion of the system from Statfjord to Kårstø; Zone 3 was the Kårstø terminal; and Zone 4 consisted of the dry gas lines from Heimdal and Kårstø to Draupner and Ekofisk. A number of other developments have also been completed to cope with additional ...

Table of contents

  • Key facts
    • Summary
    • Key issues
      • Statpipe service life extension
      • Heimdal bypass project
      • Draupner robustness campaign
      • Norwegian State acquires ownership of the Gassled pipeline network
  • Location maps
  • Participation
    • Rich Gas Leg
    • Kårstø Terminal
    • Dry Gas Line
    • Tampen Link
    • Tariffs
      • Gassled
    • Capital Costs
    • Operating Costs
  • Fiscal and regulatory
  • Economic assumptions

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Statpipe map
  • Participation: Table 1
  • Throughput: Table 1
  • Throughput: Table 2
  • Statfjord - Karstø rich gas pipeline throughput profile
  • Development: Table 1

What's included

This report contains:

  • Document

    Gassled-Statpipe

    PDF 4.29 MB

  • Document

    Gassled-Statpipe

    XLS 278.50 KB