Gato do Mato and Sul de Gato do Mato
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Gato do Mato secures FID
- Technical challenges
- Gas development solution
- Ecopetrol increases its pre-salt presence in Brazil
- History
- Local content
- Reservoir
-
Gas
- Key development metrics
- Facility
- Wells
- Oil
- Gas
- Exploration cost
- Capital costs
-
Operating costs
- Transportation cost
- Oil
- 3 more item(s)...
Tables and charts
This report includes the following images and tables:
- Reserves (2P) at 01/01/2025
- Production (2026-2034)
- Gato do Mato Production Profile
- Sul de Gato do Mato Production Profile
- Capital Costs 2019 to 2028 (US$ million)
- Index Map
- Detail Map
- Participation
- Operating Costs 2026 to 2035 (US$ million)
- Cash Flow (US$)
- PV Table (US$)
- 13 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Brazil's pre-salt coverage overview
Brazil's pre-salt is one of the most relevant deepwater plays with a huge resource base and impressive well productivity.
$1,350Q1 2025 pre-FID project tracker: Slow start to 2025 ended by go-ahead for ADNOC and Shell mega projects
Our Q1 2025 outlook for global pre-FID upstream projects.
$6,750Corumba (MMX) iron ore mine
Corumbá is an iron ore mine 100% owned by MMX that has been leased to Vetorial since 2016.
$2,250