Asset Report

Lomond

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Lomond gas/condensate field was developed in conjunction with the Everest field, 50 kilometres to the north. The area has been developed via a single integrated steel platform. Lomond is a mature field nearing the end of its life.The Erskine field has been developed with a single integrated steel platform tied back to the Lomond platform. Erskine fluids are processed and compressed in a separate module on the platform before being commingled with Lomond production for onward ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
    • Emissions
  • Development
  • Infrastructure
    • Capital costs
    • Decommissioning costs
    • Operating costs
  • 4 more item(s)...

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Index map
  • Lomond map
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Lomond production profile
  • Development: Table 1
  • Infrastructure: Table 1
  • 14 more item(s)...

What's included

This report contains:

  • Document

    Lomond

    PDF 4.35 MB

  • Document

    Lomond

    XLS 1001.00 KB