Asset Report

Na Kika

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Na Kika currently consists of seven separate subsea fields tied back to a shared semi-submersible production facility. The original five fields were Ariel (MC 429), East Anstey (MC 607), Fourier (MC 522), Herschel (MC 520), and Kepler (MC 383). First production was achieved in November 2003 when the East Anstey field came onstream. East Anstey (MC 607) ceased production in 2010 and the lease was terminated in 2011. The block is now operated by Chevron and home to the Ballymore discovery. BP ...

Table of contents

  • Summary
    • Ariel (MC 429)
    • East Anstey (MC 607)
    • Fourier (MC 522), Herschel and Manuel (MC 520)
    • Kepler (MC 383)
    • Ariel 7 (MC 430)
    • Manuel (MC 520)
    • Kepler (MC 383)
    • Fourier (MC 522)
    • 12 more item(s)...
  • Exploration and Appraisal Costs
  • Capital Costs
  • Operating Costs
  • Cash flow
  • Global Economic Model (GEM) file
  • Cash Flow

Tables and charts

This report includes the following images and tables:

  • Index Map
  • Field Map
  • Participation
  • Capital Costs Pre-2016 to 2024 (US$ million)
  • Operating Costs 2023 to 2032 (US$ million)
  • Cash Flow (US$)
  • PV Table (US$)
  • Summary Table (US$)
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2025
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2025)
  • 8 more item(s)...

What's included

This report contains:

  • Document

    Na Kika

    PDF 2.33 MB

  • Document

    Na Kika

    PDF 2.33 MB