Asset Report

PEL 92

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

PEL 92 is an oil development located on the western flank of South Australia's Cooper/Eromanga Basin. It is one of a number of small oil field groupings within the basin that are not part of the Cooper Basin Joint Venture (CBJV). It is around 90 kilometres from the CBJV operated Moomba gas and liquids processing facility. Production began in 2002 and peaked in 2009.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Well data
  • Reserves and resources
  • Production
  • Infrastructure
  • Costs
    • Royalty
    • Onshore PRRT
    • Corporate income tax
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Exchange rate
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Index Map
  • PEL 92 Detail Map
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production Profile
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • 9 more item(s)...

What's included

This report contains:

  • Document

    PEL 92

    PDF 6.02 MB

  • Document

    PEL 92

    XLS 672.00 KB