The key Malampaya gas field fuels around 20% of Luzon's power generation. Malampaya's importance as an energy source is further heightened by it being the only onstream gas field in the Philippines. The area covered by Service Contract 38 (SC38) contains the gas, condensate, and oil discoveries of Malampaya, Camago, and San Martin. In 1997 and 1998, gas sales and purchase agreements (GSPAs) with National Power Corporation (NPC) and First Gen enabled the development of the country's first, and so far the only major gas project. Under Shell's operatorship, the deep water Malampaya field was developed via subsea completions tied back to a processing platform in shallow water. Gas is exported via a 504 km subsea pipeline to a gas processing plant at Tabangao, Batangas in South Luzon. An onshore gas transmission system routes the gas from Tabangao to multiple gas-fired power plants.

Table of contents

  • Summary
  • Key Issues
    • Original participation - Occidental and Shell
    • Chevron and PNOC farm-in
    • Chevron divests to Udenna Corporation
    • Shell divests to Prime Energy
    • Historical participation
  • Planned activities
    • Phillips Petroleum
    • Occidental
    • Shell
    • Malampaya discovery
    • Post-1995 activities
    • Post-1995 activities - Camago-Malampaya oil leg (CMOL)
    • 2000-2009 - Phase 1
    • 2010-2019 - Phase 2 and 3
    • 2 more item(s)...
  • Emissions
    • Wells
    • Offshore facilities
    • Initial development
    • Phase 3
    • Phase 4
    • Onshore gas plant
    • Phase 1
    • Gas/Condensate
    • Oil
    • Phase 2
    • Phase 3
    • Maintenance contracts
  • Offshore Gas
  • Onshore Gas
  • Condensate
  • 11 more item(s)...

Tables and charts

This report includes the following images and tables:

  • Index Map
  • Detail Map
  • Participation
  • Operating Costs 2024 to 2033 (US$ million)
  • Fields and Producing Horizons
  • Reserves (2P) at 01/01/2025
  • Contingent Resources (2C) at 01/01/2025
  • Production (2015-2024)
  • Production Profile
  • Pipeline Summary
  • Capital Costs Pre-2016 to 2024 (US$ million)
  • 10 more item(s)...