Asset Report

Shetland Gas Plant

Get this report*

$2,580

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

SummaryThe Shetland Gas Plant (SGP) was constructed between 2011 and 2015 to process gas volumes from the Greater Laggan Area (GLA) fields. The plant is adjacent to the EnQuest-operated Sullom Voe Terminal (SVT). After processing at SGP, dry gas is exported to St Fergus (NSMP) via the Shetland Island Regional Gas Export (SIRGE) pipeline, which was commissioned in 2016. SIRGE connects to the Frigg UK system at the MCP01 tie-in point. Condensates are exported via SVT. SGP received first gas ...

Table of contents

  • Key facts
    • Summary
      • Summary
    • Key issues
      • TotalEnergies sells its GLA assets, including the Shetland Gas Plant, to The Prax Group
      • More throughput needed to maintain operations at Shetland Gas Plant
      • Economics will be helped by Victory tie-back
      • Glendronach downgrade due to marginal economics
      • Infill drilling and exploration upside
  • Location maps
  • Participation
    • Shetland Gas Plant (SGP)
    • Shetland Islands Regional Gas Export (SIRGE) Pipeline
    • Shetland Gas Plant throughput
    • SIRGE pipeline throughput
    • Shetland Gas Plant
    • SIRGE Pipeline

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Map
  • Participation: Table 1
  • Participation: Table 2
  • Throughput: Table 1
  • Throughput: Table 2
  • Throughput: Table 3

What's included

This report contains:

  • Document

    Shetland Gas Plant

    PDF 2.48 MB

  • Document

    Shetland Gas Plant

    XLS 330.00 KB