Sullom Voe Terminal
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- Dwindling throughput challenges long-term viability of SVT
- Pipeline link to SGP for West of Shetland gas export
- SVT site transformation
- CCUS and green energy potential
- Location maps
-
Participation
- Pipeline ownership
- Terminal ownership
-
Development
-
Key developments
- Terminal construction
- Clair field
- Gas processing plant
- Shetland Gas Plant
- West of Shetland gas export
-
Pipelines
- Brent System
- Ninian System (NPS)
- West of Shetlands (WoS) Gas System
- Clair System
-
Key developments
-
Throughput
-
Terminal
- Liquids throughput
- Gas throughput
-
Terminal
-
Costs
- Capital costs
- Cost allocation
- Shetland Islands Council
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- Sullom Voe pipeline map
- Participation: Table 1
- Participation: Table 2
- Brent System
- Throughput: Table 2
- Ninian System
- Throughput: Table 4
- Clair System
- Throughput: Table 6
- West of Shetland Gas Pipeline System (WOSPS)
- Throughput: Table 8
What's included
This report contains:
Other reports you may be interested in
Shetland Gas Plant
SummaryThe TotalEnergies-operated Shetland Gas Plant (SGP) was constructed between 2011 and 2015 to process gas volumes from the ...
$2,580Cormorant Area
The Cormorant Area comprises six oil fields in the Northern North Sea: Cormorant North, South Cormorant, Cormorant East, Pelican, Eider ...
$3,720Orlando
Orlando is a small oil field in the northern North Sea, 10 kilometres northeast of the Ninian field.The field has been developed with ...
$3,720