Ursa (MC 810)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- 2018-present
- 2010-2017
- 1999-2009
- Key Development Metrics
- Hull
- Deck/Topsides
- Tendons and Piles
- Integration and Installation
- 1 more item(s)...
- Drilling
- Satellites
- Exploration and Appraisal Costs
- Capital Costs
- Operating Costs
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
- Index Map
- Field Map
- Participation
- Reserves (2P) at 01/01/2025
- Pipeline Summary
- Capital Costs Pre-2009 to 2017 (US$ million)
- Operating Costs 2025 to 2034 (US$ million)
- Cash Flow (US$)
- PV Table (US$)
- Summary Table (US$)
- Split of Revenues
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Princess (MC 765)
Princess (MC 765) is an oil and gas field located off the northern flank of the Ursa (MC 810) field in the Mississippi Canyon ...
$3,720Golden Bear (Closed) gold mine
A detailed analysis of the Golden Bear (Closed) gold mine.
$2,250Global PV Demand Outlook 2015-2020: Exploring Risk in Downstream Solar Markets
The cumulative global market for solar PV is expected to triple by 2020 to almost 700 gigawatts, with annual demand eclipsing 100 gigawatts in 2019. Solar demand will likely be almost entirely mar...
$5,990