Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Caletones copper smelter
The smelter is located near the city of Rancagua, Chile. The capacity of the smelter is 1.4Mt conc/a (435kt/a copper). The capacity of each Tenient...
Cananea (closed) copper smelter
Smelter operations were first reported at Cananea in 1868, the matte produced from local ores being shipped to England for further processing. Mode...
Dias D'Avila copper smelter
Caraiba Metais was set up by BNDES, the national development bank to operate the Jaguarari mine and the Dias d'Avila smelter and refinery. The smel...
Flin Flon (closed) copper smelter
The Flin Flon copper smelter was commissioned in 1930 to treat concentrate from the Flin Flon mine. At commissioning the smelter operated three roa...
Alaska (closed) copper smelter
The smelter was commissioned on a greenfield site in 1959 to smelt and fire-refine concentrates for the Messina Group of Mines. Anode casting facil...
Tamano copper refinery
The refinery is located at Tamano, 15km south of Okayama, and has good road and sea links. The plant, together with a smelter, was commissioned on ...
Viewing page 32 of 472